|
Riverside Development,
|
Overview |
Through the redevelopment of East Perth and the riverside, the area will transform over the next decade into a mix of residential, commercial and public domains which capitalise on the unique setting to become a cosmopolitan waterfront community and tourist destination. The project will attract $2 billion in investment and bring 7,000 new residents into the area and attract another 6,000 workers.
Vital to the project was is the instrumentation and continued monitoring of the site by Geomotion. Being next to the river, the causeway bridge, having a high water table and being on top of an abandoned refuse area, there were many difficulties that came with large scale development. To overcome these problems a surcharge was used by Broad to consolidate the ground, coupled with 30 vibrating wire piezometers, 10 inclinometer boreholes and 8 tiltsensors on the bridge. The piezometer readings are then compiled on Geomotion's ARGUS software for an easy-to-interpret graphical representation of data. |
Company |
Geomotion Malaysia
No 23-1 (First Floor), Jalan Puteri 4/6, Bandar Puteri 47100 Puchong, Selangor Darul Ehsan, Malaysia T: +60 3 8066 3757 T: +60 3 8066 3535 E: admin@geomotion.com.my |
© COPYRIGHT 2020 ALL RIGHTS RESERVED.
|
Website by RRMS
|