Newman Hub,
|
Overview |
As part of the Rapid Growth Project 4 (RGP4), a dual trail load out structure and stockpile were constructed in the Newman Hub by the Mount Whaleback ore body.
In order to gain the neccessary information to reduce conservatism in future designs, MPD JV commissioned Geomotion to oversee the installation of 105 vibrating wire oil filled pressure cells on the walls and roof of the structure. The sensors are queried every hour, and each day the data is transferred via FTP to the head offices in Perth. |
Company |
Geomotion Malaysia
No. 2, Jalan PP11/4, Alam Perdana Industrial Park Taman Putra Perdana, 47130 Puchong Selangor Darul Ehsan, Malaysia T: +60 3 8066 3757 T: +60 3 8066 3535 E: [email protected] |