Cape Preston,
|
Overview |
Citic Pacific Mining enlisted MCC to construct the main causeway linking the port with the main mine hub. The 70m wide causeway carries the services, acts as a service route for transportation of large plant and equipment, as well as carrying the Iron Ore to the port in a slurry form. The stability of the causeway is of critical importance.
To monitor the settlement of the causeway and consolidation of the soil during and after the loading stage, Geomotion installed a series of profile tubes in the underlying mud to be read with a Hydrostatic Profile Gauge. Along with the profile tubing, piezometers were installed to monitor the dissipation of pore water pressure during consolidation. The data is used to confirm the design assumptions, and to demonstrate practically that the causeway is stable and secure. |
Company |
Geomotion Malaysia
No 23-1 (First Floor), Jalan Puteri 4/6, Bandar Puteri 47100 Puchong, Selangor Darul Ehsan, Malaysia T: +60 3 8066 3757 T: +60 3 8066 3535 E: admin@geomotion.com.my |
© COPYRIGHT 2020 ALL RIGHTS RESERVED.
|
Website by RRMS
|