|
Brisbane 'Port Connect' Project
|
Overview |
Port Connect is a $385 million upgrade of the Port of Brisbane Motorway (PoBM) being undertaken by the Queensland Government as part of its long-term plan to meet the transport needs of the Port of Brisbane and the Australia TradeCoast.
This project will deliver a duplication of the existing two-lane motorway, as well as a 3km extension. On completion of this project the PoBM will be four lanes from the Gateway Motorway through to Pritchard Street, Lytton. Geomotion drilled and installed six inclinometer boreholes and also supplied and installed this project with a number of sensors. |
Company |
Geomotion Malaysia
No 23-1 (First Floor), Jalan Puteri 4/6, Bandar Puteri 47100 Puchong, Selangor Darul Ehsan, Malaysia T: +60 3 8066 3757 T: +60 3 8066 3535 E: admin@geomotion.com.my |
© COPYRIGHT 2020 ALL RIGHTS RESERVED.
|
Website by RRMS
|