Blackbutt Range Restoration,
|
Overview |
VDM was appointed the restoration works to upgrade the D’Aguilar Highway Blackbutt range crossing as a result of nine slips which developed in January 2011. Work carried out under traffic signals with single lane traffic control over a 3km section.
VDM delivered the project under the National Disaster Relief Recovery Assistance (NDRRA) Programme and as a continuation of the FREW contract awarded in January 2011. VDM used Geomotion to monitor the ground movement and possible fail points to give forewarning and indication to whether the ground would remain stable for the works going on. To do this Geomotion provided the full service of supply, install and monitor for 24 vertical in-place inclinometers, six VW piezometers and three data loggers. The data was then processed and presented by Geomotion using the ARGUS software. |
Company |
Geomotion Malaysia
No 23-1 (First Floor), Jalan Puteri 4/6, Bandar Puteri 47100 Puchong, Selangor Darul Ehsan, Malaysia T: +60 3 8066 3757 T: +60 3 8066 3535 E: admin@geomotion.com.my |
© COPYRIGHT 2020 ALL RIGHTS RESERVED.
|
Website by RRMS
|